Rest and Be Thankful reopens with traffic controls after landslides

Bear Scotland The A83 at the Rest and Be ThankfulBear Scotland
The latest landslip saw boulders the size of cars sweep onto the carriageway

The A83 at the Rest and Be Thankful in Argyll has reopened under traffic-light control.

Engineers have completed a series of repairs and clear-up operations following a landslide on 13 September.

The road was inspected by Police Scotland and geotechnical specialists for a final safety check before one lane was reopened at 07:35.

Work remains ongoing, with the road safety barrier being reinstated as well as a temporary debris fence.

The nearby old military road had been used as a diversion after the main road was blocked by a "second significant landslide" in the space of six weeks.

Eddie Ross, of road operator BEAR Scotland, said: "Teams are continuing with mitigation work in the area to provide further landslip resilience to the route.

"We're also continuing with work on the next phase of catch-pit installation on the A83 which will add further landslip mitigation in the area."